CAUTION
Refer to “2. Items to be checked at time of delivery to customer.” on page 5 upon completion of the test
operation and make sure that all the items are checked.
If the customer’s interior work is not finished on completion of the test operation, tell the customer not to
operate the air conditioner.
Substances generated from paints and adhesives used for the interior work may contaminate the product
if the unit is operated.
When delivering the product to the customer after the test operation is completed, check that the control
box lid, the air filter and the suction grille are mounted. In addition, explain to the customer regarding the
state (ON/OFF) of the power supply breaker.
13. WIRING DIAGRAM
(Refer to Fig. 43)
1(NOTE 7) 2
TO OUTDOOR UNIT
3(NOTE 3) 4
TERMINAL FOR OPERATION
DISPLAY
5 FAN OPERATION 6 COMPRESSOR OPERATION
7
ADAPTOR FOR WIRING
(OPTIONAL ACCESSORY)
8 CONTROL BOX
9
WIRED REMOTE CONTROLLER
(OPTIONAL ACCESSORY)
10 (NOTE 5)
11
TRANSMISSION WIRING
CENTRAL REMOTE
CONTROLLER
12 (NOTE 4)
To test operation Contractors
3P249378-4D_FM6.book Page 29 Thursday, December 15, 2011 10:00 AM