SiBE05-722_A Outdoor Unit - RK(X)S25/35G2V1B
Removal Procedure 167
3.4 Removal of PCB
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
1. Remove the main PCB.
You can remove the main
PCB when you disconnect
the lead wires on the
terminal board without
removing the electrical box.
1
Feature of the main
PCB
2
Remove the screw on
the terminal board.
3
Release the 2 earth
terminals.
(R9357)
(R7256)
Terminal
board
(R9358)
Earth
terminals