Daikin BA-Series Especificaciones Pagina 175

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 230
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 174
SiBE05-722_A Outdoor Unit - RK(X)S25/35G2V1B
Removal Procedure 165
3.3 Removal of Thermistors
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
1
Release the discharge
pipe thermistor.
Be careful not to lose the clip
for the thermistor.
2
Cut the clamp.
3
Pull out the outdoor
heat exchanger
thermistor.
Be careful not to lose the clip
for the thermistor.
(R0267)
Discharge pipe thermistor
(R12279)
Clip
(R7221)
(R7222)
Outdoor heat exchanger
thermistor
Vista de pagina 174
1 2 ... 170 171 172 173 174 175 176 177 178 179 180 ... 229 230

Comentarios a estos manuales

Sin comentarios