Daikin FTXG35CVMBS Especificaciones Pagina 42

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 194
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 41
Si04-402 Control Specification
Function and Control 33
3.10 Defrost Control
Outline Heat Pump Only
Defrosting is carried out by the cooling cycle (reverse cycle). The defrosting time or outdoor
heat exchanger temperature must be more than its fixed value when finishing.
Detail Conditions for Starting Defrost
The starting conditions must be made with the outdoor air temperature and heat exchanger
temperature. Under the conditions that the system is in heating operation, 6 minutes after the
compressor is started and more than 44 minutes of accumulated time pass since the start of the
operation or ending the defrosting.
Conditions for Canceling Defrost
The judgment must be made with heat exchanger temperature. (4°C~22°C)
Frequency
Compressor
Four way valve
Fan
Electronic expansion
valve opening
ON
OFF
ON
OFF
ON
OFF
0Hz
5sec.
350pps 450pps450pps
Initial opening
PI control
5sec.
60sec.50sec. 600sec.
60sec.
(R4084)
Vista de pagina 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 193 194

Comentarios a estos manuales

Sin comentarios