Daikin FTYN35DV3B ATY35DV2 Especificaciones Pagina 98

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 128
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 97
SiBE01-503 Indoor Unit
Removal Procedure 89
1.6 Install of Drain Plug
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step Procedure Points
1
Disconnect drain hose.
The drain pan is integrated
with the bottom plate.
2
Pull out the drain plug in
the left on the drain pan
by hand.
3
Insert the drain hose,
Push it into the inner part
firmly.
4
Push the drain plug into
the right by Allen
wrench.
Push it into the inner part
firmly.
Vista de pagina 97
1 2 ... 93 94 95 96 97 98 99 100 101 102 103 ... 127 128

Comentarios a estos manuales

Sin comentarios