Daikin BSVQ96PVJU Manual de usuario Pagina 7

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 6
Accessories • Individual branch selector for VRV
®
heat recovery
5
Individual branch selector for VRV
®
heat recovery • BSVQ-P8
4 Dimensional drawing & centre of gravity
4 - 1 Dimensional drawing
BSVQ250PV1
3D056012A
NOTES
1 Electric box can also be fixed on the other side of the unit.
2 Be sure to install a inspection door at electric box side.
3 Attached pipe (1) and attached pipe (2) is used in case of
connecting with indoor capacity index more than 160 and less
than 200 In case of connecting one indoor unit of 200 type, only
gas pipe connection port need Attached pipe (1).
4 Small sound will be made when changing over the motor
operated valve, which may be disturbing. Do not install it at the
place such as bedroom under roof.
Nr Name Description
1 Suction gas pipe connection port ø22.2mm brazing connection
2 HP/LP gas pipe connection port ø19.1mm brazing connection
3 Liquid pipe connection port ø9.5mm brazing connection
4 Gas pipe connection port ø22.2mm brazing connection
5 Liquid pipe connection port ø9.5mm brazing connection
6 Electric box (note 1.)
7 Suspension brackets M8 ~M10
8 Grounding terminal M4
9 Attached pipe (1) (Note. 3) ø19.1mm brazing connection
10 Attached pipe (2) (Note. 3) ø15.9mm brazing connection
(Suspension bolt pitch)
300 or more
(Suspension bolt pitch)
(Servicing space)
Servicing space
Inspection door
(Note 2.)
Location of unit’s name plate - - - right side of electric box
300 or more
(Servicing space)
65
or
more
(Servicing
space)
400 or more
(Servicing space)
400 or more
(Servicing space)
(In case of use Attached pipe)
(Servicing space)
50
or
more
(Servicing
space)
(Note 1.)
Vista de pagina 6
1 2 3 4 5 6 7 8 9 10 11 12

Comentarios a estos manuales

Sin comentarios